NetGuardian 832A G5 Specs

NetGuardian 832A G5 Back Panel
The NetGuardian 832A monitors 32 discrete alarms and 8 analog alarms, pings 32 network elements, controls 8 relays, provides LAN reach through access to 8 serial ports, and reports via SNMP v2c or DCPX, e-mail, or pagers

Full Specifications.
Protocols: SNMPv1, SNMPv2c, SNMPv3 or DCP (depending on firmware ordering options), SNPP, TAP (Alpha) paging, Numeric paging, SMTP (Email), and HTTP (Web).
Discrete Inputs: 32 (expandable to 80, 128 or 176 see options).
Alarm Detection Speed: User-defined (3 to 999 msec).
Analog Inputs: 8.
Analog Input Range: (-92 to 92 VDC or 4 to 20 mA).
Analog Accuracy: +/- 1% of actual value.
D-Wire Sensors: 16
Control Outputs: 8 Form C relay contacts (expandable to 16, 24, 32).

Max Voltage:

60 VDC/120 VAC.

Max Current:

1 Amp, AC/DC.
Terminal server ports: Up to 8.
IP Address Ping Targets: 32
Interfaces:

8 RJ45 YOST standard RS-232 ports (see options).
2 RJ45 10/100BaseT Ethernet port.
1 RJ11 Telco jack.
2 50-pin amphenol connectors (discretes, controls, and analogs).
1 4-pin screw connector (analogs).
1 Optional. D-Wire sensor port

Modem: 33.6K internal.
Visual Interface:

LCD display with descriptive text
18 bicolor LEDs.
5 unicolor LEDs (11 with Switch Option).

Audible Interface: Alarm speaker
Dimensions: 1.75"H x 17"W x 12"D
(4.5 cm x 43.2 cm x 30.5 cm)
Weight: 4 lbs. 3 oz. (1.9 kg)
Mounting: 19" or 23" rack
Power Input: -48VDC (-40 to -56 VDC) see options
(Optional) -24 VDC (-20 to -56 VDC)
(Optional) Wide Range -24/-48 VDC (-20 to -56 VDC)
(Optional) 130 VDC
Current Draw: 200mA
Power Output: (Optional) 12 VDC or 24 VDC @ 1 amp (maximum) for external Power sensor.
Fuse: 3/4 Amp GMT for power inputs
3/4 Amp GMT for external sensor power outputs and integrated Ethernet Switch.
Operating Temperature: 32 to 140 F (0 to 60 C)
Extended Operating Temperature: (Optional) -22 to 158 F (-30 to 70 C)
Operating Humidity: 0%-95% noncondensing
RoHS 5 Approved Yes

Need a Quote?

Get it by: 4:15 PM Monday (tomorrow)

Now: 3:14 AM
Next Step:
Send Us Your Quote Request
8:00 AM Monday
We'll Start Work on Your Detailed Quote
4:15 PM Monday
Get Your Quote (Email PDF)

It's 3:14 AM on Saturday at our Fresno, CA, USA headquarters. We'll start work on your quote first thing on Monday.

Get a Quote
Sitemap